Skip to main content

bhajjankaispatpvtltd.com

+ Decision Tool / ROI

Translate performance
into payback.

Build a first-pass business case using production improvement and direct operating savings. Replace every assumption with site data before approval.

Editable assumptions INPUT

Project Basis

Installed CAPEX (₹)
Annual production (tonnes)
Contribution margin (₹/tonne)
Production / recovery improvement (%)
Annual energy saving (₹)
Annual labour saving (₹)
Annual maintenance & downtime saving (₹)